PRODUCT HISTORY

MID-LIFT®

TECHNICAL

 

Miller G-TooL™

INSTRUCTIONS

STEP 1: .700 VL CHECK

 

CLICK IMAGE

The FIRST STEP requires installing the rocker arm with the cam in the closed position, the adjustable pushrod turned in most of the way to simulate the stock length push-rod, and install G-TooL's Adjuster installed finger tight; then backed off enough to provide extending the pushrod. The MEI G-TooL should be installed atop the rocker with the .700" VL side down toward the rocker arm, as shown. Because larger valve lifts require the rocker to sit lower in relation to the valve tip, using the .700 VL SIDE side FIRST will make the next step simpler by continuing to increase the pushrod length. Turn The adjustable pushrod tip out, to elevate the back of the rocker arm until the GAP shown above has been closed. (See Page 3.)

Page 2.

MILLER MID-LIFT
The Standard By Which All Is Measured!™

954-978-2171

MillerRockers@aol.com

MID-LIFT™, PRO-SHAFT™ & PRO-STUD™ are JM Miller Trademarks; Copyright © MMIII~MMXXIV